Building America's EV Charging Network — One Strategic Site at a Time.
Wedson Energy identifies, engineers, permits, builds, and operates EV charging stations at carefully selected locations across the United States. We handle everything — so investors and landowners don't have to.
360 KW DCFC Dual Port Liquid Cool Hyper Charger — Built for High-Volume Sites
Wedson Energy deploys commercial-grade DC fast chargers engineered for reliability, throughput, and long-term uptime. Our 360 KW DCFC units deliver a meaningful charge in minutes — not hours — making them ideal for highway corridors, fleet depots, and high-traffic retail locations.
- 360 KW peak output — charges most EVs in under 20 minutes
- Dual-port simultaneous charging for maximum throughput
- CCS1 and NACS compatible — works with all major EV brands
- Remote monitoring and over-the-air firmware updates
- Designed for 24/7 commercial operation in all climates
Infrastructure-grade execution. End-to-end ownership.
We don't just install chargers. We manage every phase of the project lifecycle — from site analysis to long-term operations — so our partners can focus on returns, not logistics.
Strategic site selection backed by data
Every Wedson Energy location is chosen through a rigorous analysis of traffic volume, grid capacity, zoning, and EV adoption trends. We don't guess — we build where the data says to build.
- Traffic and demographic analysis
- Grid interconnection feasibility
- Zoning and permitting pre-screening
- Long-term revenue modeling
Turnkey management — from ground-break to revenue
Our in-house team of engineers, licensed contractors, and project liaisons manages every phase. Investors receive regular reporting. Landowners receive lease payments. No surprises.
- In-house engineering and design
- Full permitting and utility coordination
- Construction management and QA
- Ongoing operations and maintenance
Five phases. One accountable team.
Site Selection
Our analysts evaluate traffic patterns, grid access, zoning, and demographics to identify high-yield locations.
Engineering
In-house engineers design the electrical infrastructure, equipment layout, and grid interconnection plan.
Permitting
Our liaisons manage every permit, utility application, and regulatory approval — start to finish.
Construction
Vetted contractors execute the build to spec, on schedule, with full project oversight from our team.
Operations
We manage ongoing maintenance, monitoring, and revenue reporting so you never have to.
Whether you have capital or land — we have a path for you.
Invest in critical EV infrastructure
EV charging is one of the fastest-growing infrastructure categories in the US. Wedson Energy offers investors a structured path to participate — with a team that handles every operational detail.
- Recurring revenue from charging operations
- Diversified portfolio across 28+ states
- Transparent reporting and project updates
Earn passive income from your land
If you own commercial or underdeveloped land in a high-traffic area, Wedson Energy may be interested in a long-term lease. We handle everything — you simply collect your lease payment.
- Long-term lease agreements with stable income
- No construction or operational burden on you
- We handle all permits, utilities, and maintenance
One team. Every discipline.
Wedson Energy is built around a core team of specialists who have executed infrastructure projects at scale. No outsourcing the hard parts.
Engineers
Licensed electrical and civil engineers who design every installation to utility-grade standards.
Contractors
A vetted network of construction partners who execute builds on time and within budget.
Liaisons
Dedicated project managers who handle permitting, landowner relations, and utility coordination.
The infrastructure opportunity is here. Let's build it together.
Whether you're an investor evaluating the EV charging market or a landowner with a property that fits our criteria — the next step is a conversation.
